FEP — FlagOS Enhancement Proposal

English | 中文

What is a FEP

A FEP (FlagOS Enhancement Proposal) is the mechanism for managing features in FlagOS. Each cross-module or significant feature gets a FEP — a markdown design document, stored under fep/sig-*/, submitted and reviewed via PR.

Toolchain: GitHub PR + Markdown file + SIG OWNERS approval

New here? Start with the FEP Authoring Guide. Approver? See the FEP Review Guide. Governance rules are in GOVERNANCE.md.

🚩 Release Tracker

Live FEP progress per FlagOS release. Badges read from the GitHub Milestones API and update automatically. Board: FlagOS FEP Tracker (views explained in Labels, Milestone & Board).

FlagOS 2.1 FlagOS 2.2 FlagOS 2.3

Release Due Status FEP Milestone
FlagOS 2.1 2026-06-11 ✅ Released — all FEPs merged milestone/1
FlagOS 2.2 2026-09-28 ✅ Released milestone/2
FlagOS 2.3 2026-12-30 🔵 Open — accepting FEPs milestone/3

FlagOS 2.3 key dates — FEP Merge Deadline: 2026-11-13 · Feature Freeze + rc0: 2026-11-30 · rc1: 12-07 · rc2: 12-14 · Code lock: 12-25 · GA: 2026-12-30. Full schedule and freeze rules: release/2.3/schedule.md.

SIG Groups

Active SIGs (8)

SIG Modules
sig-operator FlagGems, FlagAttention, FlagFFT, FlagSparse, FlagDNN, FlagBLAS, FlagTensor, FlagAudio
sig-compiler FlagTree
sig-network FlagCX
sig-framework PyTorch-Plugin-FL, vllm-plugin-FL, sglang-plugin-FL, TransformerEngine-FL, Megatron-LM-FL, verl-FL
sig-training FlagScale
sig-kernelgen KernelGen, KernelGenBench
sig-chip Datacenter chip adaptation
sig-edge Edge hardware and edge-side SDK

Planned / Incubating

The following areas have been identified but lack Approvers; FEPs are reviewed directly by the TSC. See SIG Overview.

Area Type Modules
sig-benchmark Planned SIG FlagPerf
sig-agent Planned SIG Skills
sig-tools Planned SIG FlagRelease
sig-architecture Planned SIG Cross-module features, process changes
sig-os Planned SIG OS-level packaging, distribution integration (openKylin, openEuler)
sig-riscv Planned SIG Experimental RISC-V support — compile adaptation, dependency analysis
wg-embodied Incubating WG FlagOS-Robo
wg-ai4s Incubating WG FlagQuantum

When to Write a FEP

Scenario FEP Required?
Cross-module feature Required
New chip support Required
New module / repository Required
Major module-level feature Recommended
Single-repo minor feature / bugfix No
Documentation improvements No

FEP Lifecycle

Provisional ──→ Implementable ──→ Implemented
     │                                ↑
     ├──→ Deferred ──────────────────┘
     └──→ Rejected
Status Meaning Action
Provisional Draft, under SIG discussion Iterate in PR. A FEP may merge at Provisional — merging accepts the direction, not the final design
Implementable Design complete, Test Plan executable Raise via follow-up PR once design gaps (TODO markers) are filled
Implemented Code merged, acceptance criteria met Raise via follow-up PR; close the tracking issue
Deferred Postponed to a later release Move the tracking issue to the next Milestone; swap target/X.Y for the next release's label
Rejected Not moving forward Merge the PR with Status Rejected to preserve the decision record

Status is marked in the FEP doc as **Status:** <value> and updated via follow-up PRs at each state transition.

A FEP is in a release once its PR merges carrying that release's target/X.Y label. Whether it graduates in that release is a separate question, decided at the release's Feature Freeze: implementation code submitted by the freeze date, acceptance passed during the testing window. A merged FEP that misses the freeze is Deferred to the next release, not dropped.

Workflow

Each step lists the bookkeeping it triggers. Labels, milestone and board mechanics are defined once in Labels, Milestone & Board.

0. Socialize with SIG

Before writing a FEP, discuss the idea with the relevant SIG. Make sure there is interest in the problem space and willingness to review.

Bootstrap note: If the relevant SIG has no Chair, Approver, or meeting yet, open an Issue in the target module repository or post in GitHub Discussions. The TSC (or the ZhongZhi FlagOS Community (众智FlagOS社区) before TSC is formed) will route and review. See GOVERNANCE.md.

1. Create the FEP Document

Copy the FEP template to fep/sig-xxx/title-slug.md.

  • title-slug is a short hyphenated English description
  • Minimum content to start: the template's (Required) sections — Summary, Goals, Packaging, Test Plan. Everything else can follow later.
  • Set initial Status to Provisional

2. Open a PR

Open a PR with the FEP file.

  • PR title should describe the feature
  • PR description can be brief — the FEP doc carries the details
  • Use a Draft PR for early-stage ideas that need more discussion

Bookkeeping: label the PR FEP + sig/* (or wg/*). To target a release, set Target Version: FlagOS X.Y in the FEP header and add the target/X.Y label — the PR then shows in that release's Features Pending board view.

3. Review and Merge

Review, discussion and iteration happen on the PR.

  • SIG approvers (listed in OWNERS) approve the PR
  • Bootstrap note: If the relevant SIG has no Approver yet, the TSC reviews directly. Post in GitHub Discussions if you need help routing.
  • The bar for merging: (Required) sections in place and SIG agreement on direction. Provisional FEPs merge routinely; Implementable comes later via follow-up PR
  • Rename the file to NNNN-title-slug.md (NNNN = PR number) before merge

Merging a target/X.Y-labeled FEP puts it into that release: it moves from the Features Pending view to the SIG Roadmap view.

Bookkeeping (merger): create the tracking issue — [FEP-XXXX] <title> tracking, labeled FEP + sig/*, assigned to the FEP Owner, attached to the release Milestone. No target/* label on the issue; its release is the milestone.

Cross-SIG FEPs: Pick a home SIG whose directory the file lives in. SIGs impacted by the feature should also review. If no existing SIG fits, use sig-architecture (during bootstrap) or ask TSC for routing.

4. Implement

  • Implementation happens across the relevant repos; implementation code must be submitted by the release's Feature Freeze (date in release/X.Y/schedule.md)
  • Track related PRs in the Related PRs section of the FEP doc
  • Check off progress and attach acceptance evidence (environment, logs, metrics) in the tracking issue
  • Update the FEP doc via follow-up PRs: fill design TODOs, then raise Status to Implementable
  • After Feature Freeze: acceptance testing, bug fixes, tuning, and FEP doc updates only — no new feature code for that release; feature work for later releases continues on main

5. Wrap Up

  • When all acceptance criteria are met, update Status to Implemented via a final PR
  • Close the tracking issue — this marks the FEP delivered in the Milestone view
  • Acceptance partially unmet at release: keep Status Implementable and open a follow-up acceptance issue on the milestone for the failing part
  • Not delivered: mark Deferred, move the tracking issue to the next Milestone, swap the target/* label on the FEP PR

File Naming

Convention When
title-slug.md Before PR is created, or during early draft
NNNN-title-slug.md After PR is created, where NNNN is the PR number

Rename the file to include the PR number before merge. The PR number serves as the FEP identifier.

Roles

Role Responsibilities
FEP Owner Write the FEP, declare Target Version, fill Related PRs, drive implementation, update status, ensure acceptance
SIG Approver Review and approve FEP documents (listed in SIG OWNERS); create the tracking issue on merge
Release Manager Track overall FEP progress per version, Go/No-Go decisions; set up each release cycle (see Starting a new release cycle)

Target Version and Related PRs are the Owner's declarations — reviewers comment on them but do not fill them in. For complete role definitions and promotion paths, see contributors/roles.md.

Labels, Milestone & Board

A FEP's path through a release is carried by two artifacts — the FEP PR (design) and its tracking issue (delivery) — wired together by labels and the milestone.

Labels

Label Goes on Set by When
FEP FEP PR and tracking issue Author / merger On creation
sig/*, wg/* FEP PR and tracking issue Author / merger On creation
target/X.Y FEP PR only Owner (before merge) / Release Manager (after merge) On declaring the target release; post-merge changes only per the rules below

Release identity is carried once per artifact: the target/* label on the PR, the milestone on the tracking issue. Do not add version labels to tracking issues, and do not attach FEP PRs to milestones.

target/* changes on a merged PR go through the Release Manager only, in one of two cases: retargeting on Deferred, or entering a release after merge when the Owner declares a Target Version via follow-up PR — the latter only before that release's Feature Freeze; after the freeze the only way in is the [URGENT] channel (Review Guide). In both cases the tracking issue's milestone is updated in the same step — the follow-up PR and the milestone change are the audit record. Adding a target/* label to a merged PR by itself does not put the FEP into a release.

Milestone

  • Each FlagOS version has a Milestone (e.g., FlagOS 2.2) with a deadline set
  • Every FEP in the release has one tracking issue ([FEP-XXXX] <title> tracking), created when the FEP merges, assigned to the FEP Owner, and closed when the FEP reaches Implemented
  • The Milestone holds tracking issues (plus the release tracking issue), not FEP PRs — so milestone open/closed counts reflect real delivery progress
  • Deferring a FEP moves its tracking issue to the next Milestone; the issue is not closed

Board views

The FlagOS FEP Tracker board has one permanent view plus three per release. All views are filter-driven — items flow between them as PRs merge and issues close; nothing is moved by hand.

View Filter What it shows
All FEPs is:pr label:FEP Every FEP, across releases
X.Y Features Pending is:pr is:open label:FEP label:target/X.Y Proposed for the release, not yet merged
X.Y SIG Roadmap is:pr is:merged label:FEP label:target/X.Y In the release, grouped by SIG
X.Y Release Track is:issue milestone:"FlagOS X.Y" Delivery progress, one card per tracking issue

Starting a new release cycle

The Release Manager creates: the FlagOS X.Y milestone, the target/X.Y label, the three per-release board views per the table above, the release tracking issue, and release/X.Y/schedule.md with the cycle's dates.